BEI Tactical

Corporate
  • Chesapeake, Virginia
  • 23320
  • (757) 685-1915
PUBLIC PROFILE

ABSG: Lessons Learned from First US Offshore Wind Farm: Design, Manufacturing and Construction

Posted by Web Master 6 on November 30, 2017 5:05 PM EST
Web Master 6 photo

All stakeholders have an interest in building on the experience of existing projects to reduce investment cost, streamline the project development process and build high performing projects. From 2014 through 2016, ABS Group served as the Certified Verification Agent (CVA) for the Block Island project, the first commercial offshore wind farm in U.S. waters. In this role, we provided an independent third-party assessment of the design, fabrication and installation of the wind farm on behalf of the client.

 To access the full paper,

http://www.abs-group.com/Knowledge-Center/Insights/Lessons-Learned-from-First-US-Offshore-Wind-Farm-Design-Manufacturing-and-Construction/

There are no comments

Sign in to add your comment.

Recent Posts

NovaVis' Jeff Keever and Charles Decuir discuss the Virginia DMME Wind Energy RFP with Inside Business
Virginia is looking for plans to create an infrastructure blueprint for offshore wind energy – a...
read more
BEI Tactical had a visit from former Teammate, Astronaut, and close friend Chris Cassidy!
Keep your eyes out for a BEI T-shirt in the International Space Station in a few years!
read more
Global Technical Systems' to build new manufacturing facility in Virginia Beach.
read more
ABSG: Lessons Learned from First US Offshore Wind Farm: Design, Manufacturing and Construction
All stakeholders have an interest in building on the experience of existing projects to reduce...
read more
Triple play for Teesside crew
UK fabrication and engineering company Francis Brown has secured separate contracts from BiFab, SMD...
read more
Largest wind turbine vessel may boost intl cooperation in South China Sea
China's largest wind turbine installation vessel, the "Longyuan Zhenhua 3", could boost...
read more
Hywind Scotland, the world's first floating offshore wind farm, has started to deliver electricity to the Scottish grid.
Operated by Statoil in partnership with Masdar, the 30 MW wind farm consists of five 6 MW turbines...
read more
Constructing Offshore Wind Turbines In Port Is More Cost Effective
Constructing offshore wind turbines in port rather than onsite in variable conditions has been found...
read more
Titan 200 shows another viable offshore foundation
Developers say there are numerous factors which show the Titan Wind Turbine Platform superior to...
read more

Go to blog